Below are a number of case studies for work we have carried out:
This project was undertaken over approximately 18 months and involved the replacement of existing ductwork within the A&E facility and completely up-grading all air handling systems.
Close co-operation with our client FG Alden was needed to phase works in during shutdown periods to minimise lost time and meet contractual agreements.
Our work on the Oxford Business Park began in 1997 when we were initially contracted to carry out work on several small units requiring just simple toilet ventilation.
Over time, the area has expanded with larger fully air conditioned offices being developed on the site. We have completed several projects with our client Kier, ranging from 60k to 200k, all of them fast track builds.
The facility shown here was built at Glan Clwyd Hospital North Wales with our client Clean Modules. It consisted of a new two storey modular building craned into position. Air handling equipment and ductwork were located on the roof of the adjacent building, with medium pressure ductwork serving all areas.
All ductwork was made and fitted to clean room standards. This project along with the new "stem cell" facility at Sheffield was very successful for our clients.
We have been providing ductwork installations at a number of private residences since the late 1980's. These projects require a high degree of finishing detail which we are known to provide.
We have specific engineers who are able to give the time and patience to this type of installation. We have been invited to tender on such projects for this reason alone. Our relationship with our client FG Alden and the main contractor Holloway White Allom go back many years with this type of project.